Contents    Prev    Next    Last


Volume  Volume2\Topographical

Entry#  1001. I Italy - Canals in connection with the Arno (1001-1008).


 Contents: Vol. 1  |  Vol. 2

 

I.


ITALY.


Canals in connection with the Arno (1001-1008).


CANAL OF FLORENCE.


Sluices should be made in the valley of la Chiana at Arezzo, so that

when, in the summer, the Arno lacks water, the canal may not remain

dry: and let this canal be 20 braccia wide at the bottom, and at the

top 30, and 2 braccia deep, or 4, so that two of these braccia may

flow to the mills and the meadows, which will benefit the country;

and Prato, Pistoia and Pisa, as well as Florence, will gain two

hundred thousand ducats a year, and will lend a hand and money to

this useful work; and the Lucchese the same, for the lake of Sesto

will be navigable; I shall direct it to Prato and Pistoia, and cut

through Serravalle and make an issue into the lake; for there will

be no need of locks or supports, which are not lasting and so will

always be giving trouble in working at them and keeping them up.


And know that in digging this canal where it is 4 braccia deep, it

will cost 4 dinari the square braccio; for twice the depth 6 dinari,

if you are making 4 braccia Footnote: This passage is illustrated

by a slightly sketched map, on which these places are indicated from

West to East: Pisa, Luccha, Lago, Seravalle, Pistoja, Prato,

Firenze.  and there are but 2 banks; that is to say one from the

bottom of the trench to the surface of the edges of it, and the

other from these edges to the top of the ridge of earth which will

be raised on the margin of the bank. And if this bank were of double

the depth only the first bank will be increased, that is 4 bracciaincreased by half the first cost; that is to say that if at first 4

dinari were paid for 2 banks, for 3 it would come to 6, at 2 dinari

the bank, if the trench measured 16 braccia at the bottom; again, if

the trench were 16 braccia wide and 4 deep, coming to 4 lire for the

work, 4 Milan dinari the square braccio; a trench which was 32

braccia at the bottom would come to 8 dinari the square braccio.


Contents    Prev    Next    Last


Seaside Software Inc. DBA askSam Systems, P.O. Box 1428, Perry FL 32348
Telephone: 800-800-1997 / 850-584-6590   •   Email: info@askSam.com   •   Support: http://www.askSam.com/forums
© Copyright 1985-2011   •   Privacy Statement